Analysis of Revenue Distribution of Assembly Building under EPC Model Based on Entropy Weight-TOPSIS Improved Shapley Value

Authors

  • Yanming Yue Nanhang Jincheng College, Nanjing 211156, China; College of Materials Science and Engineering, Nanjing Forestry University, Nanjing 210037, China https://orcid.org/0009-0008-3174-9328
  • Shuo Wang College of Materials Science and Engineering, Nanjing Forestry University, Nanjing 210037, China
  • Zeli Que College of Materials Science and Engineering, Nanjing Forestry University, Nanjing 210037, China

Keywords:

EPC, Prefabricated construction, Shapley value method, Profit distribution

Abstract

Prefabricated construction has rapidly developed due to its efficiency and environmental benefits. With the widespread application of the EPC (Engineering, Procurement, and Construction) model, achieving fair and reasonable distribution of profits in prefabricated construction projects under this model has become an urgent issue that needs to be addressed. In response to the limitations of the traditional Shapley value method, this paper introduces input factors, technological factors, and management factors to develop an improved profit distribution model based on entropy-weighted TOPSIS and the Shapley value. A case study is presented to validate the model, aiming to achieve fair and equitable profit distribution.

Downloads

Published

2024-11-13

How to Cite

Yue, Y., Wang, S., & Que, Z. (2024). Analysis of Revenue Distribution of Assembly Building under EPC Model Based on Entropy Weight-TOPSIS Improved Shapley Value. BioResources, 20(1), 322–330. Retrieved from https://ojs.bioresources.com/index.php/BRJ/article/view/24017

Issue

Section

Research Article or Brief Communication