Analysis of Revenue Distribution of Assembly Building under EPC Model Based on Entropy Weight-TOPSIS Improved Shapley Value
Keywords:
EPC, Prefabricated construction, Shapley value method, Profit distributionAbstract
Prefabricated construction has rapidly developed due to its efficiency and environmental benefits. With the widespread application of the EPC (Engineering, Procurement, and Construction) model, achieving fair and reasonable distribution of profits in prefabricated construction projects under this model has become an urgent issue that needs to be addressed. In response to the limitations of the traditional Shapley value method, this paper introduces input factors, technological factors, and management factors to develop an improved profit distribution model based on entropy-weighted TOPSIS and the Shapley value. A case study is presented to validate the model, aiming to achieve fair and equitable profit distribution.
Downloads
Published
2024-11-13
How to Cite
Yue, Y., Wang, S., & Que, Z. (2024). Analysis of Revenue Distribution of Assembly Building under EPC Model Based on Entropy Weight-TOPSIS Improved Shapley Value. BioResources, 20(1), 322–330. Retrieved from https://ojs.bioresources.com/index.php/BRJ/article/view/24017
Issue
Section
Research Article or Brief Communication